• News Releases

  • November 28, 2018
    Endeavour Silver Reports High Grade Silver-Gold Intersections In Multiple Veins From 2018 Drill Program At The Bolanitos Mine, Guanajuato, Mexico
  • October 31, 2018
    Endeavour Silver Reports Third Quarter, 2018 Financial Results; Conference Call At 10am Pt (1pm Et) Today
  • October 15, 2018
    Endeavour Appoints Vice President, Operations
  • October 11, 2018
    Endeavour Silver Produces 1,428,828 Oz Silver And 12,968 Oz Gold (2.4 Million Oz Silver Equivalents) In The Third Quarter, 2018
  • September 19, 2018
    Endeavour Silver Reports Multiple High Grade Infill Drill Intercepts And Files Prefeasibility Study Technical Report For The Terronera Mine Project, Jalisco, Mexico
  • August 30, 2018
    Endeavour Silver Reports Updated Ni 43-101 Mineral Resource And Reserve Estimates And An Updated Pre-Feasibility Study For The Terronera Mine Project, Jalisco, Mexico
  • August 29, 2018
    Endeavour Silver Reports Company-Wide Initiatives To Reduce Capital, Operating And Other Costs, Temporary Halt Of El Compas Plant Operations To Re-Commission The Tailings Facility
  • August 2, 2018
    Endeavour Silver Reports Second Quarter, 2018 Financial Results; Conference Call At 10am PDT (1pm EDT) Today
  • July 25, 2018
    Endeavour Silver Drilling Intersects 269 Gpt Silver And 5.5 Gpt Gold Over 1.1 Metres (19.9 Opt Ageq Over 3.6 Ft) At Calicanto Property, Zacatecas, Mexico And Provides Development Update For The El Compas Mine
  • July 10, 2018
    Endeavour Silver Produces 1,355,895 Oz Silver And 13,674 Oz Gold (2.4 Million Oz Silver Equivalents) In The Second Quarter, 2018